Motukea Island to Nansha Pt: ocean shipping schedules
Ocean shipping from Motukea Island to Nansha Pt takes about 45 days in transit (1 carrier sail this lane, incl. Swire Shipping), based on 17 tracked sailings. The fastest observed carrier is Swire Shipping at 45 days. Compare all carriers and upcoming departures below.
Oceania lane · schedule data as of Jul 28, 2026.
How long does shipping from Motukea Island to Nansha Pt take?
Shipping a container from Motukea Island to Nansha Pt takes about 45 days port to port on a typical sailing. The fastest carrier we track, Swire Shipping, does it in about 45 days. Transit varies by carrier and service loop. Compare each line below.
| Carrier | Transit time | Sailings |
|---|---|---|
| Swire Shipping | 45 days | 17 |
- Fastest carrier: Swire Shipping, about 45 days port to port.
- Most sailings: Swire Shipping, 17 tracked sailings across 1 services.
Carriers on Motukea Island → Nansha Pt
Every line running this lane, ranked by how many sailings we track, with each carrier's service count and median port-to-port transit.
| Carrier | Sailings | Services | Median transit |
|---|---|---|---|
| Swire Shipping | 17 | 1 | 45 days |
Transit by carrier
Upcoming departures
The next confirmed sailings on this lane: vessel, carrier, service loop, and dates.
| Vessel | Carrier | Service | Departs | Arrives | Transit |
|---|---|---|---|---|---|
| APIA CHIEF | Swire Shipping | PNG ASIA | Jul 26, 2026 | Sep 9, 2026 | 45d |
| APIA CHIEF | Swire Shipping | PNG ASIA | Sep 13, 2026 | Oct 28, 2026 | 45d |
| CARPENTERS ORION | Swire Shipping | PNG ASIA | Aug 23, 2026 | Oct 7, 2026 | 45d |
| FIJI CHIEF | Swire Shipping | PNG ASIA | Jul 24, 2026 | Aug 19, 2026 | 26d |
| FIJI CHIEF | Swire Shipping | PNG ASIA | Sep 4, 2026 | Sep 30, 2026 | 26d |
| FRIDA RUSS | Swire Shipping | PNG ASIA | Aug 16, 2026 | Sep 30, 2026 | 45d |
| FRIDA RUSS | Swire Shipping | PNG ASIA | Oct 4, 2026 | Nov 18, 2026 | 45d |
| KOTA GABUNG | Swire Shipping | PNG ASIA | Aug 21, 2026 | Sep 16, 2026 | 26d |
| RABAUL CHIEF | Swire Shipping | PNG ASIA | Aug 7, 2026 | Sep 2, 2026 | 26d |
| RABAUL CHIEF | Swire Shipping | PNG ASIA | Sep 18, 2026 | Oct 14, 2026 | 26d |
Motukea Island to Nansha Pt: FAQ
How long does shipping from Motukea Island to Nansha Pt take?
Typical ocean transit on the Motukea Island–Nansha Pt lane is around 45 days port to port, though it varies by carrier and service loop. See the carrier table above for each line's median.
Which carriers sail Motukea Island to Nansha Pt?
1 carriers run this lane, including Swire Shipping.
How often do ships depart Motukea Island to Nansha Pt?
Across the schedule window we track about 17 sailings on this lane from 1 carriers, so departures run multiple times per week.